Project Summary

We are successfully executing a high-value, large-scale coal logistics project for Central Coalfields Limited (CCL), involving the loading and transportation of coal from Amrapali Mines to the Shivpur Railway Siding and further loading of coal into the railway wagons. Designed to ensure seamless coal movement over a 4-year period, the project handles an impressive 70,000 metric tonnes of coal daily subject to coal availibility — showcasing our capacity to manage extensive volumes with precision.

With a total project estimated value of ₹1125.90 Crores, this assignment reflects our robust infrastructure, skilled workforce, and commitment to operational excellence. From efficient loading at the mine site to timely delivery at the railway siding, every phase is being executed in compliance with the highest safety, environmental, and quality standards. The project played a critical role in maintaining uninterrupted fuel supply for downstream consumers and reinforced our reputation as a trusted partner in India's coal logistics and infrastructure ecosystem.

image not found
image not found
image not found

Project Highlights

  • End-to-End Coal Handling: Comprehensive execution from mine-face loading, delivery at the railway siding and finally wagon loading.
  • High-Density Coal Corridor: Managing continuous movement through a dedicated coal logistics route.
  • Heavy-Duty Fleet Operations: Deployed a large fleet of HEMMs and tippers for uninterrupted, round-the-clock transportation.
  • Strategic Supply Chain Support: Enabled consistent coal dispatches to meet power sector demands, reducing idle time and demurrage.
  • Operational Benchmark: Set new standards in project scale, safety, and logistical coordination in one of CCL’s key mining zones and gaining trust of CCL as one of their largest contractors.

Project info:

Project Name: Loading and Transportation of Coal – Amrapali Mines to Shivpur Railway Siding
Location: Amrapali Mines to Shivpur Railway Siding, Central Coalfields Ltd. (CCL), Jharkhand
Scope Of Work: Loading and transportation of coal from Amrapali Mines to Shivpur Railway Siding
Contract Duration: 4 Years
Total Quantity: 1,022.00 Lakh Tonnes
Clients: Central Coalfields Ltd. (CCL)
Project Cost: ₹1125.90 Crores
Status: Ongoing
alt