Project Summary

We were awarded with the loading and transportation of coal from Amrapali Open Cast Project (OCP) surface stock to Phulbasiya Railway Siding for a duration of two years. This critical operation is being executed with a strong focus on efficiency, safety, and timeline adherence.

Valued at ₹211.56 Crores, the project played a key role in enhancing coal evacuation infrastructure, enabling faster and reliable coal movement from stockyard to railhead, supporting downstream logistics and power generation operations.

This project demanded transportation of coal for a total distance of 70+ kms though various villages and required round the clock operations for which we developed in house team for monitoring of fleet movement through advanced GPS systems. the desired target per day was 8000 tons and total quantity of the contract was 5.8 million metric tons.

image not found
image not found

Project Highlights

Fleet: Deployment of high-capacity tippers/dumpers for round-the-clock operation
  • Focus:
         Timely dispatches
         Safety compliance
         Dust and environmental control measures
  • Impact:
         Strengthens last-mile connectivity
         Supports uninterrupted coal supply chain for power sector and industries

Project info:

Project Name: Loading and Transportation Of Coal– Amrapali OCP to Phulbasiya Siding
Location: Amrapali Opencast Project (OCP) to Phulbasiya Railway Siding, Jharkhand
Scope Of Work: Loading and transportation of coal from surface stock at Amrapali OCP to Phulbasiya Siding
Contract Duration: 2 Years
Clients: (Central Coalfields Ltd. (CCL)
Project Cost: ₹211.56 Crores
Status: Completed