Project Summary

As part of our commitment to delivering high-performance industrial infrastructure, we have successfully completed the installation and commissioning of a 600 TPH Coal Crusher at Basundhara Mines, operated by Mahanadi Coalfields Limited (MCL) – a subsidiary of Coal India Limited.

This large-scale project was designed to modernize coal handling operations, improve throughput, and minimize manual intervention by integrating advanced crushing and loading technology.

image not found
image not found

Project Highlights

The successful execution of this project has significantly enhanced coal processing efficiency at Basundhara Mines by:
  • Reducing operational delays through on-site crushing
  • Improving loading turnaround times for transport vehicles
  • Lowering operational costs through mechanization
  • Supporting higher daily dispatch volumes
  • Meeting environmental and safety compliance standards
This project stands as a testament to our capability in delivering high-value, end-to-end solutions for India's evolving coal and mining sector.

Project info:

Project Name: Installation of 600 TPH Coal Crusher at Basundhara Mines
Location: Basundhara Mines, Mahanadi Coalfields Ltd (MCL), Odisha
Scope Of Work: Installation of a 600 TPH coal crusher including integrated systems for crushing, loading, and transportation of coal
Capacity: 600 Tons Per Hour (Capacity)
Project Cost: ₹91.00 Crores
Status: Successfully Completed
alt